Sunday, June 23, 2013

Real-World Energy Storage

. . . in a project involving The Smart Grid . . .

Central to the initiative, which is a part of the Pacific Northwest Smart Grid Demonstration Project, was PGE’s partnership with Eaton and EnerDel Inc. PGE worked with EnerDel to outfit the center with a 5 MW lithium-ion battery system, and Eaton provided engineering support and two-way power inverters to manage and operate the energy storage system.

With the new technology,  PGE will be able to test energy storage, dispatchable standby generation, remotely operated power-line switches, demand response, renewable energy integration and transactive control.

Source: http://electricalcontractor.com/?p=9908

able electric auto electrical repair construction electrical electrical how to

No comments:

Post a Comment